Case Details:
Case Number:
2017-00308
Case Status:
Approved by Commission
Utility/Industry Type :
Other
Utility/Industry Subtype :
Other
Case Type :
REQUEST FOR APPROVAL
Case Subtype :
WAIVER
Pertaining to Utility/Company :
INSOURCE RENEWABLES, LLC
Case Title :
REQUEST FOR APPROVAL OF A WAIVER OF CHAPTER 313 PERTAINING TO INSOURCE RENEWABLES, LLC.
Initiating Filer :
INSOURCE RENEWABLES, LLC
Case Start Date :
11/20/2017
Assigned Staff :
Beverly.Shejen,
Faith.Huntington,
LYNN.A.FORTIN,
Lee.Ewing,
Matthew.Rolnick,
Mitchell.Tannenbaum
View Case References
Filings (72)
Data Requests (0)
Public Comments (24)
Active Party and Notification List (8)
Assigned Staff (6)
Loading...
Item No.
Date Filed
Description Of Filing
Filing Party
Filed By
No of Attachments
Deleted Filings
72
4/26/2018
ORDER GRANTING WAIVER - ReVision Energy
Commission, MPUC
Commission, MPUC
1
71
4/25/2018
Amended Waiver Request
REVISION SOLAR, LLC (RPS)
Hinchman, Stephen Farwell
2
70
4/24/2018
Request for Waiver - Peter Lord - SunVersion, LLC
SUNVERSION LLC
Crosscup, Patrick
1
69
4/23/2018
ORDER GRANTING WAIVER - SunVersion, LLC
Commission, MPUC
Commission, MPUC
1
68
4/6/2018
ORDER GRANTING WAIVER - Penobscot Solar Design
Commission, MPUC
Commission, MPUC
1
67
4/6/2018
Request for Waiver - Penobscot Solar Design
PENOBSCOT SOLAR DESIGN
Dejoy, Daryl
1
66
4/2/2018
ORDER GRANTING WAIVER -Maine Energy Performance Solutions
Commission, MPUC
Commission, MPUC
1
65
3/30/2018
Request for Waiver - Maine Energy Performance Solutions
MAINE ENERGY PERFORMANCE SOLUTIONS
Bowers, Steve
1
64
3/28/2018
ORDER GRANTING WAIVER - Sunversion, LLC
Commission, MPUC
Commission, MPUC
1
63
3/28/2018
Request for Waiver - Town of Porter - Sunversion, LLC
SUNVERSION LLC
Crosscup, Patrick
1
Per Page
1
of
8
First
Prev
Next
Last
Go To
1
2
3
4
5
6
7
8
View By Set
View By Question
Loading...
Loading...
Loading...
Posted By
Posted Date
Comments
Attachment(s)
Richard Roughgarden
Maine Solar Engineering
PO Box 57 Palermo, ME 04354
Email ID: rroughga@fairpoint.net
Phone No.: 207-242-6558
3/5/2018
Maine Solar Engineering is requesting a waiver for two solar system installations that are under contract and scheduled to be completed before 5/1/2018. The planning and installation scheduling relied on December 11, 2017 order. The systems are as follows: 1. Brent Zachau - general contractor, System owner George Sugden, location 62 Bayview Lane Bowdoinham, ME, contract date 2/12/2018. 2. Michael Fortin owner, location 392 Rome Road Mercer, ME, contract date;1/31/2018.
docket2017-00308.pdf
Harry O Pollard IV
True Enterprises llc
196 Chases pond rd
Email ID: harry@trueenterprisesllc.com
Phone No.: 207-660-1455
12/6/2017
True Enterprises, LLC is involved in the installation of grid-tied solar electric systems in Maine and New Hampshire. Our work in Maine includes system installation in CMP's service territory. With uncertainty surrounding the procedures CMP will use to establish the in-service dates for systems installed at the end of each calendar year, we would like to see the waiver request filed by Insource Renewables approved by the PUC. It is our hope that this waiver will provide the time necessary to resolve key issues that need to be clear for our clients and for our company. Thank you for the opportunity to comment.
Steven L Weems
Solar Energy Association of Maine
P.O. Box 5417 Augusta, ME 04330
Email ID: slweems@gmail.com
Phone No.: 207-751-9437
12/1/2017
Please note the attached comments on Case # 2017-00308. The Solar Energy Association of Maine wholeheartedly supports the Request for Approval of a Waiver in this case
Solar Waiver Request Comments 12-1-17.docx
Linnea L Koons
PO Box 55 Kents Hill ME 04349
Email ID: llkoons@outlook.com
Phone No.: 207-320-5537
12/1/2017
I support the wavier petition filed by Insource Renewables in this proceeding. A waiver is necessary to ensure that net energy billing customers like me are treated fairly during the transition period while utilities develop new operational procedures to comply with the Commission's Amended Chapter 313 Rules. Specifically, in my case contracts and applications were signed and filed in a timely fashion. See following: ? Solar and battery agreements with ReVision Energy - 7/26/17 ? New account assigned by CMP - 8/7/17 ? Interconnection notice signed and filed - 10/16/17 ? CMP verification of account - 11/6/17 I have attached the signed agreements with ReVision Energy, the Interconnection Notice and the account verification from CMP. Please let me know if I can be of further assistance. Linnea Koons
LK Tesla Powerwall System Agrmnt_encrypted_.pdf
CMP email 11-6-17.pdf
LK Interconnection Application - signed 1.pdf
LK Solar Energy System Agreement_encrypted_.pdf
Eric Cobb
1960
PO Box 105
Email ID: eric@back40events.com
Phone No.: 207-212-4044
12/1/2017
We support the wavier petition filed by Insource Renewables in this proceeding. A waiver is necessary ensure that net energy billing customers like me/us are treated fairly during the transition period while utilities develop new operational procedures to comply with the Commission's Amended Chapter 313 Rules. Specifically, in my case, we have been trying to reach CMP on a daily basis for the last 3 weeks. They are not receiving phone calls.
Jason Beaulieu
245 Cousins Rd
Phone No.: 207-754-3934
11/30/2017
I support the wavier petition filed by Insource Renewables in this proceeding. A waiver is necessary ensure that net energy billing customers like me are treated fairly during the transition period while utilities develop new operational procedures to comply with the Commission's Amended Chapter 313 Rules. Specifically, in my case it has been over 3 months that a simple paper work procedure from CMP has prevented me from turning on my PV system. I advanced my plan to build a new house primarily because I wanted to take advantage of the current net energy metering rules while they still existed.
Mark Follansbee
33 Arbor View Lane
Email ID: follansb@maine.rr.com
Phone No.: 207-885-9745
11/29/2017
I support the wavier petition filed by Insource Renewables in this proceeding. A waiver is necessary ensure that net energy billing customers like me/us are treated fairly during the transition period while utilities develop new operational procedures to comply with the Commission's Amended Chapter 313 Rules. Specifically, in my case for the Andrus Community Solar farm that is waiting for CMP to hookup to the farm. I recognize the CMP has a backlog due to the wind storm earlier this year.
Christopher Harris
86 Tuttle Road Cumberland Me 04021
Email ID: charris@khinsurance.com
11/28/2017
I support the wavier petition filed by Insource Renewables in this proceeding. A waiver is necessary ensure that net energy billing customers like me are treated fairly during the transition period while utilities develop new operational procedures to comply with the Commission's Amended Chapter 313 Rules. Specifically, in my case CMP has been significantly delayed in getting the new transformer installed. Although CMP was paid for the upgrade work and cashed my check in Oct, they misplaced the transaction and have not completed the work. The State wide power outage added to this mess and it is now almost December and I still do not have a connection. I am in strong support for this waiver. thank you
Michael Mayhew
Heliotropic Technologies, P.A.
60 Campbell St Heliotropic Technologies
Email ID: coolsolarguy@yahoo.com
Phone No.: (207) 633-1061
11/27/2017
RE: Heliotropic Technologies, P.A.'s Support for Petition for Waiver Heliotropic Technologies, P.A., (Heliotropic Technologies)) respectfully supports the requests that the Commission grant a temporary waiver related to the definition of Effective Date in Section 3(H) of Chapter 313. Heliotropic Technologies, has been involved with developing and installing a range of solar systems since 1980, with our solar projects built in greater Portland, through mid-coast Maine as well as in Somerset County and in the Kennebec Valley region. We have been engaged in the installation of net metered solar energy systems in Maine for a dozen years. During this time, we've had minor concerns related to the timelines for executing net energy billing agreements and approving interconnection applications. We have seen certain projects effected by charges from CMP that were later determined by the PUC to be unnecessary and excessive, and pushed to have these charges removed for future Maine citizens. Some of the dealings with CMP have caused frustration but the policy issues of electric energy compensation and metering 'gross generation' on the customer's property is very controversial and is effecting Heliotropic Technologies' business and is confusing to potential clients in Maine. It is believed that the amended rules for Chapter 313 have placed greater importance on the timelines for executing net energy billing agreements and utility upgrades. Since these timelines are not defined in Chapter 313 nor in Chapter 324, we are uncertain of how to communicate to customers how they will be treated if their system is installed toward the end of the year. As a result, we support Insource Renewables' petition requesting a waiver on the in-service date for new net energy billing facilities until the utilities have developed written procedures to address these issues.Thus, Heliotropic Technologies requests that the Commission grant this temporary waiver.
Chris Graham
309 Libby Road Pownal, ME 04069
Email ID: cgraham2002@gmail.com
Phone No.: 207-409-5425
11/27/2017
We support the wavier petition filed by Insource Renewables in this proceeding. A waiver is necessary to ensure that net energy billing customers like me/us are treated fairly during the transition period while utilities develop new operational procedures to comply with the Commission's Amended Chapter 313 Rules. Specifically, in our case we will potentially be waiting for CMP to complete the install/upgrade of a transformer while everything else will be ready for activation. We want to ensure that we will be grandfathered into the 1 to 1 credit as the transformer upgrade is out of our control.
Per Page
1
of
3
First
Prev
Next
Last
Go To
1
2
3
Notification List
Active Party List
Loading...
Name of Person/Company
Representing Company
Mailing Address
Email/Phone/Fax
Barnes, Justin
Email ID: regtrackdsire@gmail.com
Phone
Fax:
Bowers, Steven
598 Augusta Road
Washington ME 4574
Email ID: meps@mepsenergy.com
Phone Extn: 0
Fax:
Ferzly, Nicolas
MA
Email ID: eyes-ears@seadvantage.com
Phone
Fax:
Georgitis, Robert W
Email ID: kasprzakinc@roadrunner.com
Phone
Fax:
Hewitt, William
500 US Route 1, Suite 107
Yarmouth ME 04096
Email ID: whewitt@HewittLegalAdvisors.com
Phone Ph: 207-846-8600
Fax:
Monaco, Albert
1717 Alna Road
Alna ME 4535
Email ID: ocreek@tidewater.net
Phone Extn: 0
Fax:
Mueller, Fortunat
91 West Main Street
Liberty ME 04949
Email ID: fortunat@revisionenergy.com
Phone Ph: 207-221-6342
Fax:
Regulatory Administration, Debra Mills
83 Edison Drive
Augusta ME 04336
Email ID: CMPRegAdmin@avangrid.com
Phone Ph: 207-242-8438
Fax: Fax: 207-621-4714
Per Page
1
of
1
First
Prev
Next
Last
Go To
1
Loading...
Loading...
Staff Name
Role
Ewing, Lee
Hearing Examiner
FORTIN, ETHELYN
Support Staff
Huntington, Faith
Staff Analyst
Rolnick, Matthew
Staff Analyst
Shejen, Beverly
Support Staff
Tannenbaum, Mitchell
Hearing Examiner